Most EMC test failures come from a short list of causes, and most of them can be found and fixed on the bench before the product reaches a chamber. This guide sets out where products usually fail, what each failure tends to point to, and the design checks worth making before you book lab time.
Radiated emissions: cables and clocks
Radiated emissions are a frequent failure, and the cause is often not where the noise is made. A fast clock or a switching regulator puts noise on the PCB, but the cable plugged into it is long enough to radiate that noise far better than the PCB itself. That is why a product can pass on the bench and fail once it is cabled up and closed in its enclosure.
Things to check:
- Clock harmonics. Note your clock and data rates and their harmonics. A peak at an exact multiple of a clock frequency tells you where to look.
- Cable exits. Every cable that leaves the enclosure needs filtering or a shield bonded to the chassis at the point where it leaves. A shield connected through a long wire (a "pigtail") does much less good than one bonded all the way round.
- Return paths. A signal trace that crosses a gap or slot in the ground plane forces its return current on a long detour, and that loop radiates. Keep fast signals over solid, unbroken ground.
- Enclosure seams and slots. Openings, ventilation slots and painted joints let energy out. Small changes, such as a gasket or more screws along a seam, can move a result noticeably.
Conducted emissions: the power supply
Conducted emissions are measured on the supply leads, and the usual source is the switching power supply. Noise at the switching frequency and its harmonics travels back down the mains or DC cable.
Things to check:
- Input filtering sized for your switching frequency, placed where the supply enters the product rather than somewhere inside it.
- Decoupling close to each power pin, with short connections to ground.
- Tight current loops around the switching transistor, diode and inductor, which keep the noisy area small.
- If you buy in a power supply, its own test results apply to that supply on its own. Your product's wiring and load can change the picture.
ESD: where the discharge goes
Electrostatic discharge testing applies sparks to the points a user can touch: buttons, connectors, seams and screens. The basic test method is set out in IEC 61000-4-2, which was revised as a third edition in March 2025, so ask the lab which edition it tests to. ESD failures usually show up as resets, lock-ups, frozen displays or lost data rather than damage.
Things to check:
- Each touchable point should give the discharge a short, deliberate path to chassis or ground that stays away from sensitive circuits.
- Protection devices on exposed connectors, placed at the connector and not further inside.
- Reset and enable lines kept short and filtered, so a nearby discharge cannot trip them.
- Firmware that recovers on its own from a glitch, such as a watchdog, where your test plan allows automatic recovery.
Immunity: radiated, conducted, transients and surge
Immunity tests check that the product keeps working while it is exposed to disturbances. The IEC 61000-4 series covers the methods, including radiated radio-frequency fields, conducted radio-frequency disturbances on cables, fast transient bursts, surges and supply dips. The product standard for your equipment decides which apply and at what level.
Immunity failures often come back to the same features as emissions failures. An unfiltered cable that radiates noise out will also bring noise in. Analogue inputs, sensor lines and long unshielded leads are the usual weak points. Surge and fast transient failures point to the protection and filtering at the power and signal entry points.
One cause of immunity "failures" sits outside the design: an unclear pass criterion. Agree with the lab, before the test, what the product must do during each test and what counts as a failure. A test plan that says "the display may flicker but must recover without a reset" saves a long argument in the chamber.
Wireless products
Products with radios add another layer. Bluetooth, Wi-Fi, cellular and GPS modules sit next to fast digital circuits, and they can interfere with each other as well as with the test. A certified radio module does not mean the finished product passes, because the layout, antenna placement and host circuits around it are new.
Design checks before you book
- Run a pre-compliance scan on a production-representative sample, fully cabled and in its enclosure.
- Note the frequencies that sit close to the limit, and find their source with near-field probes.
- Check every cable exit for filtering or a bonded shield.
- Walk the PCB for fast signals crossing gaps in ground.
- Touch-test every exposed point with an ESD gun if you have access to one.
- Write the operating modes and pass criteria for each immunity test.
- Confirm the standards, editions and limit class you are testing to.
Our guide to pre-compliance or full compliance testing explains how a pre-scan fits before the formal test, and lists what to bring to the lab on the day.
Questions to ask a lab
- Can your engineers help find the source of a failure on the day, or is that a separate consultancy booking?
- Can we bring ferrites, gaskets and filter parts to try if a test is close?
- How is a re-test quoted after a design change?
- Which edition of each standard do you test to?
Where to go for more
GOV.UK publishes guidance on the Electromagnetic Compatibility Regulations 2016, including the emissions and immunity requirements a product must meet. The IEC webstore lists the current edition of each IEC 61000-4 test method.
Find EMC help on EMC Directory
If a design needs work before formal testing, compare UK labs and consultants offering pre-compliance testing and EMC consultancy and design. When the product is ready, find labs for full compliance testing. Save the companies that fit to your shortlist and send one enquiry to the whole shortlist at once. Details in any directory are what each company states, so confirm them with the lab before booking.
For press enquiries about EMC Directory, contact emc@emcdirectory.co.uk.
Listings related to this article
Electromagnetic Testing Services Limited
Stebbing, Essex
Electromagnetic Testing Services holds UKAS accreditation (schedule 4416) with a flexible scope covering commercial and automotive EMC testing, operating from Stebbing, Essex since incorporation in 1992. The lab's work spans commercial, industrial, medical, railway and military product testing, with pre-compliance testing, on-site testing from a mobile unit and EMC consultancy alongside.
- Full Compliance Testing
- On-Site Testing
- EMC Consultancy / Troubleshooting
- Design Review / DFM for EMC
EMC Hire Ltd
Shefford, Bedfordshire
EMC Hire Ltd operates an EMC test facility in Shefford, Bedfordshire, offering pre-compliance and self-certification testing with or without a test engineer, and on-site EMC testing at customer premises. Tests cover emissions and immunity to commercial, automotive and defence standards using a GTEM cell and a hire fleet of EMC and RF equipment. The company also provides EMC training, RF EMF surveys and problem resolution support, with consultancy through its partner WEMEC Ltd.
- Pre-Compliance Testing
- On-Site Testing
- EMC Consultancy / Troubleshooting
- Chamber / Equipment Hire
Kiwa Electrical Compliance (Blackwood)
Blackwood, Caerphilly
Kiwa Electrical Compliance runs a UKAS accredited EMC and electrical safety laboratory at Pontllanfraith, Blackwood, South Wales, operated by Kiwa Ltd. The site tests IT, multimedia, medical, laboratory, industrial control, domestic appliance and gaming equipment for radiated and conducted emissions, harmonics and flicker, and for immunity to ESD, fast transients, surge, conducted and radiated RF, magnetic fields and voltage dips. Design stage debugging and on site EMC testing for large or high current equipment are also offered.
- Full Compliance Testing
- Pre-Compliance Testing
- On-Site Testing
- EMC Consultancy / Troubleshooting

Product Approvals Ltd
Telford, Shropshire
Product Approvals works as a product-certification consultancy from Telford, established in 2006 to help manufacturers and importers reach UKCA, CE and other overseas approvals. It has run its own in-house EMC test lab since 2018, with a semi-anechoic chamber covering the full emissions and immunity suite, offered on a CE/UKCA self-certification basis rather than as a UKAS-accredited lab; testing can be carried out in-lab or on-site for large equipment. It also runs a separate assembly and test facility for low-to-medium volume production.
- Pre-Compliance Testing
- On-Site Testing
- EMC Consultancy / Troubleshooting